Specifying Around the Reused-Steel CE-Marking Bottleneck
This article is a placeholder. Only its topic and title are committed at this stage; the substantive body will be drafted in a future cycle of the engine.
Specify reclaimed structural steel sections in a way that triggers the EN 1090-2 inspection-and-re-marking pathway (Type 3.1 or 2.2 Inspection Certificate), arrange the testing in advance with a notified body, and price the re-marking into the project. The entry walks through the compliance pathway many enthusiastic projects have stumbled on.